Anqing Dazhai River & Huanshitang Lake | Integrated Pump Gate Solution – Kaiquan

The Anqing Dazhai River and Huanshitang Lake Flood Control Improvement Project is an important municipal water infrastructure project designed to address regional flooding issues and enhance urban flood resilience. For this project, Kaiquan provided a customized integrated pump gate solution combining pumping and water-control functions into one system.

The project adopted winch-lifting integrated pump gates with a specification of 4.5 m × 4.6 m. A total of 6 sets of single-gate double-pump units were supplied, achieving a combined drainage capacity of 33.6 m³/s, with each pump rated at 200 kW.

Kaiquan integrated pump gate solution for the Anqing Dazhai River and Huanshitang Lake project

Key Technical & Operational Features

Integrated Pump Gate Design

The solution combines pumping equipment and gate control functions into an integrated system, simplifying project construction while improving overall water-control efficiency.

High-Capacity Flood Control

With a total flow rate of 33.6 m³/s, the system provides powerful drainage capability to support urban flood prevention and improve regional water safety.

Customized Municipal Water Management Solution

Designed according to the local drainage requirements, the integrated pump gate system provides reliable operation for complex urban water-control applications.

Impact & Industry Recognition

Through the Anqing Dazhai River and Huanshitang Lake project, Kaiquan demonstrated its ability to provide integrated water-control solutions beyond traditional pumping equipment. The project contributes to improved urban flood resilience and supports comprehensive water environment management in Anqing.