Zhuhai Changlian Petrochemical Project

Project Overview: Zhuhai Changlian Petrochemical Co., Ltd. utilizes advanced technologies such as French IFP continuous reforming and liquid-phase hydrogenation. Major production facilities include a 120,000 tons/year pre-treatment unit, 1,000,000 tons/year catalytic reforming unit, 400,000 tons/year aromatics extraction distillation unit, 800,000 tons/year post-fractionation unit, and a 200,000 tons/year benzene and toluene hydrogenation unit.
Key Results: During Phase I and II construction, virtually all double suction pumps, fire pumps, feed water pumps, vacuum pumps, and chemical pumps were supplied by Shanghai Kaiquan. Specifically, the Shenyang Kaiquan factory delivered over 110 sets of petrochemical process pumps, with a total contract value exceeding 5 million RMB. After two years of continuous on-site operation, the pumps have demonstrated highly stable and reliable performance, ensuring smooth project execution and earning full recognition from Changlian Petrochemical.